top of page
Camden Project
Finished by 2016
586
Modules
1250
Beds
22
Floors
294,931
Size (GSF)
Key Feature
-
High-rise Challenges. Highest building by prefabricated module technology in 2017.
-
Structure Challenges. Building site right above the main tube in north London.
-
Short building lead time by ModularX module technology – 1/3 building lead time compared to traditional building method.
Challenges
-
High-rise Challenges. With concrete elevator core, rest residential area with Modular X steel module stacking from 2nd floor.
-
With BIM technology to collaborate with design, manufacturing and inspection approval.
Interior
-
All living function in one single module unit
-
Perfect For Hotel / Student hostel / Senior Housing and etc

See More of Our Work