Camden Project
Finished by 2016

586

Modules

1250

Beds

22

Floors

294,931

Size (GSF)

Key Feature

  • High-rise Challenges. Highest building by prefabricated module technology in 2017.

  • Structure Challenges. Building site right above the main tube in north London.

  • Short building lead time by ModularX module technology – 1/3 building lead time compared to traditional building method.

Challenges

  • High-rise Challenges. With concrete elevator core, rest residential area with Modular X steel module stacking from 2nd floor.

  • With BIM technology to collaborate with design, manufacturing and inspection approval.

Interior

  • All living function in one single module unit

  • Perfect For Hotel / Student hostel / Senior Housing and etc