North Acton Site 9 & 10 Project
Finished by 2022
612
Modules
1250
Beds
8
Floors
279,861
Size (GSF)
Key Features
-
With BIM technology to collaborate with design, manufacturing and inspection approval.
-
Traditional & Modern façade combination challenges with typical UK brick and Corten steel façade installation.
Challenges
Project next to main traffic road – challenges with very limit space for module loading and on-site installation.
Interior
-
All living function in one single module unit
-
Perfect For Hotel / Student hostel / Senior Housing and etc